Simulation analysis of the oil pipe between injection-production system packers
ABSTRACT:
Downhole
oil-water separation and reinjection technology can effectively solve the
problem that the moisture of produced fluid is getting higher and higher, and
as a key component of the injection-production system, injection-production
string withstands packer's seating axial force, internal pressure, external
pressure of oil and multi-load conditions, thereby resulting in the bending
deformation of oil tube, and then causing the systems running eccentric wear,
cards pumps and other phenomena. In this paper, the deformation of oil pipe
between the injection-production system packers were mechanical simulation
analyzed, and obtained the effective measures to reduce pipes bending
deformation, to guarantee efficient and safe operation of the pipe, and then
the injection-production system can run smoothly for a long time.
Further details to visit : http://www.jocpr.com/
For more details PDF Link: http://www.jocpr.com/articles/simulation-analysis-of-the-oil-pipe-between-injectionproduction-system-packers.pdf
Comments
Post a Comment